The schedule register
Open Rates & resources → Resource library and select Day/Card rates. The register is a read-only list of your schedules:
Select a row to open the schedule. Each row’s menu has Open and, for admins, Edit.
The header keeps Show archived schedules, + New schedule, and Import Schedule of Rates. Duplicate, archive, and restore are on the schedule’s own page.
Open a schedule
Opening a schedule shows it on a full page at/rates/day-rates/schedules/:scheduleId. The page opens on the revision in force today. A schedule that hasn’t been issued yet opens on its draft. Use the Revision selector in the header to switch to another revision. Each revision has its own address, so you can bookmark it or send the link.
The page shows:
- The header: the schedule’s name, status, and client, with Back to day/card rates.
- The facts: revision, In force from (or Starts for a draft), Until, Contract reference, Line wording (Ours or The client’s), and Inherits from.
- Terms: the revision’s terms text.
- Schedule lines: code, unit, kind, rate, Maps to, and internal cost for each line.
- Revision history: every revision with its status, dates, and when it was issued. The Issued date uses your company’s time zone.
Page actions
Edit a schedule
- Open the schedule and select Edit, or choose Edit from the row’s menu in the register.
- The same page turns into inputs and the header shows Discard and Save changes.
- Make your changes.
- Select Save changes.
A superseded revision can’t be edited. An archived schedule is read-only until you restore it.
Lines
On a draft, every line in the Schedule lines table is an input row:- Code: optional.
- Unit: the line’s unit.
- Kind: Flat, Fixed, or Cost plus.
- Rate: for Flat and Fixed lines, the day rate. For a Cost plus line, enter the % over cost instead.
- Maps to: optional links to rate items or activities for internal cost and margin. See Map a line to an internal cost.
Issue a draft
- Open the draft.
- Check its dates, terms, and lines. The Effective from date must be later than the revision in force.
- Select Issue.
Update estimates after issuing
Straight after you issue, the Update estimates using {schedule}? dialog opens. It lists every in-progress estimate whose project uses this schedule, grouped by project. For each estimate it shows the estimate, type, status, the number of lines using the schedule, and the current total, new total, and difference.- Tick the estimates that should move to the new rates. Nothing is ticked to start with.
- Select Update n estimates, or select Skip to move nothing.
- moves its project to the new revision;
- moves each of its day-rate lines to the matching line in the new revision;
- keeps any rate an estimator edited by hand;
- leaves a line that isn’t in the new revision on its old rate, marked No longer in the schedule.
Cut a new revision
To change the rates in force, open the current revision and select New revision. Stralos copies its lines and mappings into a new draft and opens it in Edit. A schedule can have only one draft. If one already exists, the page says A draft already exists and links to it with Open the draft.Map a line to an internal cost
Maps to links a line to up to 20 rate items or activities. You can mix both on one line. Each link is an alternative charged at the line’s one sell rate; Stralos never adds their costs together. For a combined cost, such as a truck with an operator, link one activity whose build-up includes both. Links let Stralos work out internal cost and margin. They don’t change the sell rate, estimate totals, or the schedule issued to a client.- Select Edit.
- In the line’s Maps to field, type into Add a resource or activity (optional) to search.
- Select a choice from Rates or Activities. Repeat to add another link. Each link appears as a chip; use its remove button to remove it independently.
- Select Save changes.
Review costs and margins
The Schedule lines heading shows how many lines are linked. Show unlinked lines filters the table to lines without links. With several links, Internal cost and margin show a low–high range across the alternatives that can be costed. Hover over or focus the cost to see each link’s figures and the names of any links that couldn’t be costed. One link shows a single figure; no links shows Not linked. Overall margin also shows a low–high range and says how many linked lines it covers. The low end uses each line’s highest cost; the high end uses each line’s lowest cost. Unlinked lines and lines with no usable cost and margin are left out. When both ends match, it shows one figure. If a line can’t be costed, the Internal cost column explains why:Export a revision
Select Export on the schedule’s page:- Print / Save PDF opens a print layout in the browser. Use your browser’s Print function to save it as a PDF.
- Download Excel downloads the revision as an
.xlsxworkbook.
Review base changes
When a schedule inherits from a base schedule and the base has been updated, the register shows Review required and the page says This revision requires base review. Select Review base changes to open the review page. The review page groups every line outcome. Base pricing rules, such as a Fixed line’s charge or a Cost plus percentage, are grouped separately. For Removed by the base lines, tick the lines you want to remove. Unticked lines become independent local lines rather than being deleted. Your removal ticks are saved as you work. If you leave the page and come back, your ticks are restored, provided the base hasn’t changed while you were away. If it has, you’re asked to check every outcome again. When you’ve reviewed everything:- Create draft revision applies the base changes in a new draft revision and takes you back to it. Only the revision in force can create this draft.
- Acknowledge — keep Rev n records that you reviewed the changes without changing the contractual lines. The revision stays pinned to the old base until a draft is created from it.