Tabs
- Overview: a strip of six summary tiles, followed by the Resource summary table and the price breakdown.
- Takeoff: page, scale, and measurement records.
- Estimate Builder: work items and project rates, each accessible as a section within this tab.
- Tender Submission: Ready to submit for what is still open before the tender goes out, Departures and clarifications for departures, clarifications, and included or excluded clauses, Markup (or Margin on a margin-basis estimate) for tender pricing defaults and rungs, Estimate schedule for the priced schedule, Tender review when it is turned on for your company, and Tender download for the branded PDF, Excel, and Word files you send to the client. See Tender submission.
Overview summary tiles
The six tiles at the top of the Overview tab summarise the estimate in one row:- Total cost: the total cost across all top-level work items.
- Markup — the markup amount. When cost is positive, a helper line shows markup as a percentage of cost. When cost is zero, only the dollar amount is shown.
- Tender price (excl. GST) — cost plus markup, after contingency, before tax.
- Estimate items: the count of top-level schedule lines; sub-items are listed separately so they are not counted twice.
- Resources — the number of unique resources across the estimate.
- Duration: the project’s duration, taken as the longest single work item, because items run side by side. It is worked out on screen from the items’ activities, the same way as the schedule’s Max / total duration column, and is not part of any export.
Resource summary table
The Resource summary table on the Overview tab shows every resource aggregated across the estimate. Resources are grouped into bands in resource group order: Labour, Plant & Vehicles, Materials, Bulk Materials, Disposal, Subcontractors, Day/Card rates, and Other. The rate group bands use your company’s rate group names. Each band shows its resource count, total cost, and allocated price. Bands start open; select a band’s heading to fold it. Each resource sits on one line, with Category, Items (how many work items use it), Total quantity, Average unit cost, Total cost, Margin, and Allocated price. On a narrow card, Margin, Average unit cost, Category, and Items drop out in that order. Above the table, search by resource name, filter by category, or select group chips (each with its count) to show only those groups. Clear filters resets them, and a count line shows how many resources are listed.- Each resource row allocates the work item’s proportional markup to that resource’s share of cost. If the sell allocation for a resource cannot be represented (for example, when the cost-to-price ratio is extreme), the cost and price columns both show Cost unavailable rather than $0.00 or a misleading figure.
- When one or more resources have no priced cost, a warning appears above the table: “N resources have no priced cost. Review before submitting.” Review the affected work items before finalising the estimate. Resource rows that represent reused site excavation material are excluded from this count.
- Item pricing adjustment rows appear when a work item’s stored totals differ from the sum of its resource build-up. These rows reconcile the table to the server-owned totals and are labelled with the work item name. A distributed pool section shows a Distributed pool adjustment row for the same reason. Adjustment rows are hidden while a filter is active.
- The Estimate total (all resources) row at the foot of the table always covers the whole estimate, whatever the filters show. It equals the Total cost and Tender price (excl. GST) tiles.
Source documents changed
If a drive file the estimate uses has changed or been deleted in the drive since you used it, an amber banner says how many source documents changed. Each changed file is listed with when the version you used and the drive’s version were modified, and by whom.- Select Review to open Review changed sources. For each changed file, choose Sync to add the drive’s new version beside the one you used, or Keep to keep using the version you have. If the newer version is already in Stralos, the row offers Keep using followed by the version name (for example Keep using Version 1), which keeps your current version and clears the item flags for this estimate.
- For a file deleted from the drive, select Got it to dismiss it for this estimate.
Needs attention
When the estimate has lines that may need action, an amber Needs attention strip appears in two places. It surfaces three categories:- Unpriced lines — work items that have a quantity but no price. Each listed item shows its number and name with a View link that opens it in the detail pane. Items inside a distributed Shared Costs pool are excluded because their cost has already been recovered as other rows’ Shared Costs share.
- $0 resource lines: work items whose total price is non-zero but that contain at least one resource row priced at $0 with a quantity. Each item shows a View link. Resource rows that represent reused site excavation material are excluded from this check: their $0 cost is intentional because the cost was already captured in the excavation activity.
- Rate exceptions — when the estimate has rate exceptions, the count appears with a Review link that opens the Rates tab.
Manage estimates
When the project’s Multiple estimates setting is on, the Overview tab shows a Manage estimates button above the summary. It opens the project’s Estimates sheet over the page, where you can create, duplicate, rename, make primary, or delete estimates. See Managing estimates. The button is not shown on the Delivery estimate.Overview loading state
While work items are still loading, the Overview tab shows a spinner and the message Loading estimate summary… instead of displaying zeroed totals. Summary figures and the commercial build breakdown appear once the work-item list is ready.Estimate being prepared
When you open a project that was created very recently, the estimate record may not be ready yet. The workspace displays Preparing the estimate for this project… and checks again automatically every 5 seconds. No action is required — the page opens by itself once the estimate is ready.Estimate Builder sections
The Estimate Builder tab contains two sections, selectable from a secondary navigation row:- Estimate schedule: estimate scope lines, quantities, components, status, production data, and pricing review. The schedule header shows Total cost, Margin or Markup (according to the estimate’s pricing basis), and Tender price figures inline beside the section title so the key numbers are visible without scrolling to the Overview tab.
- Project Rates: project-specific rate overrides for this tender.
Project Documents
Documents are managed on the project Documents page, which sits alongside the estimate workspace in the project menu. The project Documents page lists every document associated with the project — synced and manually uploaded — and is where you route documents into the estimate, run AI processing, and review suggestions. Navigate there from the project menu, or follow a suggestion review link from within the estimate workspace.Project context
Stralos keeps the selected project in context. If you switch projects from the project selector, project estimate pages update to the newly selected project. If you follow a link or bookmark to a specific estimate that no longer exists, has been removed, or belongs to a different project, Stralos redirects you to the project’s current primary estimate at the same page within the workspace. The redirect preserves the sub-path, query string, and any hash, so you land on the same tab or view as intended.Switching between estimates
When a project has Multiple estimates turned on in Project Settings, a dropdown appears directly beneath the Estimate entry in the project navigation rail. It shows the name of the open estimate. Select it to see the project’s estimates and switch to a different one. The dropdown lists live estimates with the primary estimate first, marked with a star (★), then the rest alphabetically. Not-awarded estimates are hidden behind a Show not awarded toggle. Selecting an estimate opens the same screen in that estimate. For example, if you are on the build-up for one estimate, switching opens the build-up for the one you chose. The page swaps the data in place: it dims briefly while the new estimate loads, then the same panels reopen with the new estimate’s data. If you have a work item open when you switch, Stralos opens the item with the same number in the new estimate. For example, if item 3.2 is open, the switch opens item 3.2 in the new estimate. If the new estimate has no item with that number, a message says Item 3.2 is not in this estimate and the work items list opens instead. A project change, a direct reload, or opening the bare estimate address still loads the page in full. Select Manage estimates… at the bottom of the dropdown to open the Estimates sheet over the page you are on. See Managing estimates. When Multiple estimates is off, the dropdown is hidden and the Estimate rail entry opens the project’s single estimate as usual.How areas work together
Project setup, rates, documents, and estimate records stay connected in the workspace. A project gives the estimate its client, reference, status, and location context. Rates and activities provide reusable pricing data. Documents provide summaries and suggestions that you review before creating or changing estimate records.Estimate status
An estimate moves through a set of statuses that reflect where it sits in the lifecycle. It covers estimates being priced, submitted, and awarded.
Once a tender is submitted, the estimate is frozen. Work item edits, component changes, margin-ladder updates, and all other writes that affect totals are blocked. Takeoff measurements and departures and clarifications are also frozen — the submitted tender document is preserved exactly as submitted.
Use Revise tender to return the estimate to Draft when edits are needed.
Frozen tender
Once an estimate leaves Draft or Review, its pricing and tender document data are frozen. The estimate workspace shows a banner that names the committed tender revision and the date it was submitted. The server rejects writes to:- Pricing — work item builds, component changes, margin-ladder updates, and estimate-level pricing settings.
- Takeoff measurements.
- Departures and clarifications.
- Markup (or Margin): every margin and markup shows as text, with a note that the estimate is read-only.
- Calculators: New calculation, Copy, and Delete are disabled, and calculators cannot be renamed. You can still open a calculation to read it.
- Calculator workbench: every field shows its saved value as text. Save, Remove calculator, Add a measurement, and linking are disabled and say why. The back link, Advanced mode, and the assignments view still work.
- Work item Calculations tab: you can switch between Measurements and Layer destinations and read them, but Add a measurement and Remove are disabled and layer destinations cannot be changed.
- Project rates: read-only for this estimate. See Read-only project rates.
Lifecycle actions
The estimate workspace header shows action buttons for the current stage of the tender. The available buttons depend on both the estimate status and the project lifecycle status.- Submit tender — freezes a tender revision. The first submitted estimate on a project moves the project to Submitted; later submits leave the project status as it is. The confirmation dialog names the estimate, the tender price from the Overview, the revision number this submit will freeze, and that the revision cannot be changed afterwards. Use Revise tender to change the price after submitting. If the tender price has not finished loading, the dialog says so — check the Tender price (excl. GST) tile on the Overview before you confirm. A draft or review estimate shows Submit tender even when the project already has another submitted estimate — each estimate’s header reflects that estimate’s own status. Submit tender is not offered while the project is at Lead. A Lead project moves to Estimating when you first save a change to the estimate, and Submit tender then appears without a page reload.
- Revise tender: reopens the tender. Stralos first saves the submitted tender as a version, then returns the estimate to Draft. See Versions saved by Revise tender and Reopen. The project moves back to Estimating only when no other estimate on it is still submitted. The next submit freezes a new revision.
-
Mark won — available to admins and to leads of the project. Mark won appears only on an estimate that is itself Submitted; other estimates on the same project do not show it.
- With Multiple estimates on, it opens a side sheet that lists the project’s submitted tender estimates. Select the estimate the client awarded, then confirm. The selected estimate becomes the primary estimate, the project moves to the awarded lifecycle stage (normally displayed as Won), and the contract baseline is created from that estimate’s latest submitted tender revision. Any other live estimates on the project are hidden as not-awarded — they are kept read-only, and you can show them again with Show not awarded in the rail or the Estimates sheet.
- With Multiple estimates off, a confirmation names the estimate and the tender revision the contract baseline is created from.
- Mark lost… — records a required reason category and moves the project to Lost. If you type a reason note and then try to close without submitting, Stralos asks you to confirm before discarding it.
- Reopen: reopens a lost project and returns the estimate to Draft. As with Revise tender, Stralos first saves the submitted tender as a version. Prior tender revisions are retained.
- Winning estimate — shows a persistent banner such as Won — contract position is baselined. The stage name follows the platform-managed project status list. The estimate remains editable as a working document.
- Not-awarded estimates — shows a Not awarded — read-only banner. Another estimate on the project was marked won, so this one is kept as a record. It can be viewed and duplicated, but not edited.
Estimate settings
The estimate header shows an Estimate settings button that opens the Estimate settings sheet. Settings are per-estimate — each estimate in a project has its own values.- Hours per working day — the number of hours in a working day for this estimate. Every duration-priced line uses this value. Accepts a value greater than
0and up to24. It is seeded from the project when the estimate is created. Saving other settings without touching this field leaves it unchanged. - Default markup % or Default margin % — applied to any estimate item without its own override. A negative value is accepted and causes those items to be priced below cost; a warning is shown while the value is negative.
- Contingency % — added once to the tender price.
- Quantity source — Schedule of quantities or Measured off the plans. Imported SOQ quantities are read-only until you edit them; measured quantities always stay editable.
Estimate versions
The estimate header shows a Versions button that opens the versions panel. This panel saves immutable, numbered snapshots of the working estimate and lets you restore an earlier snapshot as the working estimate.Saving a version
- Select Versions in the estimate header.
- Enter an optional name for the snapshot, for example Client review, or leave it blank.
- If the tender has a quote number, decide whether it takes the new version’s quote number. The new version always gets the next quote number. Leave Also update this tender’s quote number ticked to give the tender that number too, or untick it to keep the tender’s current number. The option is not shown once the tender is submitted, won or lost.
- Select Save new version.
Restoring a past version
Each saved version shows an Open in new tab link and a Restore… button. Open in new tab opens that version read-only in a new browser tab, so you can review it without leaving your working estimate. Versions saved in the older view-only format show View instead. Selecting Restore… opens a Restore version dialog before anything is changed. The dialog asks you to choose how prices should be handled after the restore:- Keep the version’s saved prices — every price is exactly as it was when the version was saved. Project rates, margins, and price choices all come from the version. Nothing is recalculated.
- Reprice with current rates — the version’s items and quantities come back, but they are priced at the estimate’s current project rates and the rate library as they stand today. The dialog shows a preview of how many lines would change price and by how much.