Start a review
- Open Estimate Builder → Work Items in the estimate workspace.
- Select Schedule review in the Estimate schedule header. The review opens in a side sheet. On a wide screen you can keep working on the schedule behind it.
- Select Start a review.
Choose the documents
The document list works as it does in Tender review: documents the estimate uses and the ones Stralos recommends start ticked, and Select all documents ticks or unticks every document that can be read. See Choose the documents for the groups and badges. Schedule review offers the takeoff drawings, the documents your estimate items came from and the contract documents. Tick Check build-up if you also want Stralos to look at each item’s build-up: items with none, quantities and units that don’t fit the item, plant, labour or materials that don’t suit the work, and calculations that are out of date with the takeoff. Rates and prices aren’t checked. It starts unticked for every new review. Select Start review, or Prepare files and start review if some documents still need reading. You can select up to 60 documents. If you select none, Stralos still checks your items against the takeoff and calculators, but it can’t look for missing work in the drawings, scope or contract.While the review runs
Stralos shows the review’s progress in four steps: reading your documents, gathering your schedule (items, measurements and calculators), checking items, quantities, units and duplicates, and checking quotes against the documents. Step 3 also says how many drawing pages Stralos is looking at. A review usually takes 2 to 5 minutes. You can close the sheet and come back; the review carries on. If documents still need reading, select Check now without them to start with the ones that are ready, or Cancel check to stop. Findings appear under Found so far as the AI writes them. They are provisional until the review finishes.Review the findings
A finished review shows its number, when it started and who started it, then the counts by severity and by status, and a short overview. Findings are grouped under:- Missing items: work the drawings, scope or contract call for that has no estimate item.
- Quantities: item quantities that don’t match the takeoff, a calculator or a quantity in the documents. A difference of more than 5% is flagged.
- Units and descriptions: units that don’t suit the work, or descriptions that don’t match what the source measures.
- Duplicates and orphans: the same work in two items, items whose source has gone, and takeoff measurements or calculators that nothing uses.
- Build-up: only on a review with Check build-up ticked. These findings are advice only: make any build-up change yourself.
Go to an item
Select a finding’s title or one of its Item buttons to go to that item. The sheet closes, and the schedule scrolls to the item and highlights it. If the item is no longer in the schedule, Stralos says so. When you reopen Schedule review, it comes back where you left it: the same review, the same filters, the same scroll position, and the finding you came from, highlighted for a moment. Moving to a different project clears this. Another estimate in the same project keeps its own place.Apply a fix
Many findings have an Apply button with a one-line summary of the fix. Select Apply to see exactly what will change, then confirm, or select Keep it as is to leave the estimate alone. A fix can:- change an item’s quantity, unit or description
- link an item’s quantity to a takeoff measurement or calculator output
- add a missing item, without a price (price it afterwards)
- delete a duplicate item
- the estimate is read-only, for example once the tender has been submitted (you can still run a review and read the findings)
- the item’s quantity is fixed by the client’s schedule of quantities
- the item is a provisional sum
Run another review
Select Start a new review to choose documents and run the review again. Earlier reviews are kept under Previous reviews. Select one to open its findings.Limits
- Up to 60 documents per review.
- One review at a time on each estimate, and at least a minute between reviews.
- Your company can run 50 reviews in any 24 hours, counting Tender reviews and Schedule reviews together.

