A day-rate schedule holds agreed sell rates, such as “20 t excavator with operator, $1,450 / day”. The rates already include overheads and margin. When you add a line from a schedule to a work item’s build-up, Stralos prices it at the schedule rate and adds no markup. The rates you can pick come from the project’s day-rate set. See Day rates in a project.

Day-rate line or cost rate?

Stralos has two kinds of rate that can be priced per day. They behave differently: If you’re pricing what the work costs you, add a Resource. If you’re charging an agreed day rate, add a Day/Card rate.

Add a day-rate line

From the build-up’s add row

  1. Open the work item’s build-up.
  2. In an activity’s add row (or Activity 1 when the item has no activity yet), change the type to Day/Card rate. The Choose a day/card rate sheet opens straight away.
  3. Find the line and select it. The sheet closes and the add row shows the line’s code and description. Select it again to change your choice.
  4. Add the line, then set its quantity on the line (see Quantity). A Fixed line is always quantity 1.
Under All types, the add row’s search also lists the project’s day-rate lines, each starting with Day/Card rate. The activity’s Add resource sheet also has a Day/Card rates tab.

From the component editor

  1. Open the component editor for a new build-up line.
  2. Set Build-up line type to Day/Card rate.
  3. Pick the line from the list that appears. Until you pick one, the editor shows Choose a day/card rate to continue.
  4. Enter the quantity and resource count, then save.
Day/Card rate is offered only for work items that belong to a project, because the set belongs to the project.

Use the picker

The Choose a day/card rate sheet shows one section for each schedule in the project’s set:
  • Client schedules come first, headed “{client} — {schedule} · Rev n, from {date}”. Your company’s schedules follow, headed “{schedule} · Rev n, from {date}”.
  • Each row shows the line’s code, description, unit, and rate. A Fixed line has a Fixed badge.
  • Type in Search by code or description… to narrow the list.
The picker only offers Flat and Fixed lines. Cost-plus lines stay in the schedule but can’t be added to a build-up. That work is priced from your tender rates instead.

Add a schedule from the picker

Below the project’s lines, the sheet lists Other day/card rate schedules: your company’s and the client’s schedules that aren’t in the project yet. Select Add to this project beside a schedule to add it without leaving the build-up. Adding a schedule adds all of its lines, fixed to the revision in force today, the same as Add schedule in Project settings → Day/Card rates. The sheet then reloads so you can pick from the new schedule. A schedule whose revision hasn’t come into force yet shows its start date instead of Add to this project.

When the project has no day-rate schedules

If the project’s set is empty and the sheet has a schedule you can add, it says This project has no day/card rates yet. Please add a schedule from the list below, then pick a day/card rate from it. Otherwise, the picker says This project has no day/card rate schedules and offers Open Project settings → Day/Card rates. The component editor’s picker always shows this message, because it has no list of other schedules.

The line in the build-up

Day-rate lines sit in their own Day/Card rates group, after Subcontractors. The line’s source reads “Day/Card rate · {schedule} Rev n”.

Quantity

How the quantity works depends on the line: Resource count can be changed on any day-rate line, for example 2 excavators. You can’t link a day-rate line’s quantity to takeoff or a calculator. A day-rate line is never promoted to the activity library.

Rate

The line’s name and unit come from the schedule and can’t be changed in the build-up. The rate can be changed:
  1. Type the new rate into the line’s Rate cell.
  2. The line shows Edited (schedule $X), where $X is the schedule’s rate.
  3. Select Revert to go back to the schedule’s rate.
An edited rate still takes no markup.

Margin and markup

A day-rate line sells at exactly what it costs:
  • Cost = sell = quantity × resource count × rate. Its margin is 0.
  • The margin ladder (overrides, categories, rate groups, tender and company defaults) doesn’t apply. The margin cell shows ”—” and can’t be set.
  • On Tender Submission → Estimate items → View, the line is locked and reads Day/Card rate — no markup.
  • An item’s Markup % applies only to the item’s other lines. The day-rate cost is added on top, unmarked.
  • Day-rate cost takes no share of Shared Costs. A work item made only of day-rate lines takes no share at all.
  • The labour multiplier never applies.
For example, a work item has $1,000 of resource lines, $2,000 of day-rate lines, and a 15% markup. It sells at $1,000 × 1.15 + $2,000 = $3,150. Your client never sees line markups. A day-rate line only changes the work item’s total.

Notes on a line

A day-rate line can show these notes: To move an out-of-step estimate to the new revision, use Update in Project settings → Day/Card rates.

Copies and versions

If something goes wrong