The Rates tab
The Rates tab lists every project rate for this estimate. By default it groups rates by item, with each supplier price shown as a row underneath. Items are in the same order as the Resource library: by category, then item name, with Uncategorised last. Select the Item, Category, supplier, or Project cost column heading to sort by it, and again to reverse the order. The sort is kept in the page address. Switch to Supplier view to see one section per supplier, with that supplier’s quote reference, validity, and the total value carried in the estimate. In item view, select Quote order to list imported rates in the order their lines appear on each supplier’s quote, newest quote first. Rates that did not come from an import follow in the default order. Select Quote order again to return to the default order.Toolbar filters
Use the toolbar to narrow the list:- Search: matches against item name, supplier code, supplier name, or quote reference.
- Category, Supplier, and Unit multi-selects filter to the matching rows.
- Quick-filter chips show counts and filter to that subset:
- Not costed: rates attached to a work item but not yet in its cost.
- Project only: rates that are not in the Resource library.
- Quote expiring: quotes whose valid-until date is within 45 days.
- Expired: quotes past their valid-until date. Expired prices continue to price work items until you replace them; the Expired badge marks them.
Rate preference chips
Rate preference chips may appear above the grid and show the project’s stored rule order. Earlier entries take priority when more than one covers a line. See Rate preferences to review or change the rule list.Row actions
Each supplier price row has a menu with the following actions:- Open: navigate to the price’s own detail page. The supplier name in item view is also a link to the same page.
- Insert into estimate items…: add the rate as a cost line in one or more work items. Disabled on a submitted estimate. See Inserting a rate into a work item.
- Where it’s used: open a drawer showing which work items carry this price in their cost, and which are attached but not yet costed.
- Edit: open the rate in the right-hand drawer to update the price, quote reference, valid-until date, or notes. For a supplier’s price, you can also update the Supplier code and Supplier’s name for this item. These two fields are hidden for your company’s own prices. For a project-only rate, admins can also change the Category. If the save button is disabled, a reason appears beside it naming the first field that needs attention.
- Update from import: open the rate importer aimed at this price, so the matching row in a newly imported supplier quote replaces it. Disabled on a read-only estimate. See Replacing placeholder prices.
- Add to Resource library: available to admins for project-only rates; promotes the price to the shared library. The project keeps its own price.
- Delete: remove the rate. The delete dialog shows the affected rate and names the work items whose cost will fall back to another project price or the Resource library, and any attachments that will be removed. The record is kept for history.
Read-only project rates
Project rates lock per estimate. Once an estimate is submitted (or won, lost, archived, not awarded, or opened as a saved version), its own project rates are read-only and a banner explains why. Add rate, Import rates, Insert into estimate items…, Update from import, Edit, Add to Resource library, and Delete are disabled; Open and Where it’s used still work. An alternative estimate on the same project keeps its own rates editable.Project rate detail page
Each project price has its own page, opened by selecting Open from the row menu or clicking the supplier name in item view. The page has a stable URL you can share with a colleague or bookmark. The page shows:- Price: the project cost rate, supplier name, location, supplier code (supplier prices only), quote reference, quote date (when recorded), valid-until date, rate sheet (for imported prices), density (for bulk materials), conversion factor (for stock units priced per length, roll, sheet, or pack, and per-metre rates sold in set lengths), and notes. A note beneath the facts shows the current library cost range followed by the project cost when library prices are available. If no library comparison is available, it shows the project cost on its own.
- Price history: every recorded change to this price, newest first. Each entry says what happened (Price added, Price changed, Details changed, Price deleted, or Price replaced), when, who made it, and how (for example Added by hand, Edited by hand, or Imported from the file name). It also shows the old and new values of each field that changed. Select Show older changes to see earlier entries.
- Where it’s used: the work items that carry this price in their cost and any that are attached but not yet costed, with quantities and line costs.
- Record: when the price started applying, when it stops (if it has an end date), when it was added, and when it was last changed. Dates in this section are shown in the project’s timezone. This section reflects what the price record itself carries, not a full audit history.
Adding a project rate
There are three ways to add a project rate:- By importing a spreadsheet or quote file: select Import rates on the Project Rates page to open the rate importer. Upload a supplier’s spreadsheet or PDF quote, review the extracted lines, and confirm the ones you want. The imported rates are saved to the current estimate’s project rates and the page re-prices any affected work items automatically when you return. See Import project rates from a file for the full import steps.
- From document review: upload a supplier quote as a project document, process it, and accept the extracted quote lines from the Project Rates tab in the suggestion review panel. Each line is reviewed and confirmed individually. See Accepting a supplier quote line.
- Manually: select Add rate from a supplier band in Supplier view, or use + Add another supplier’s price in Item view.
- Choose a resource: search the Resource library by name and select a resource. The supplier/location section appears once a resource is chosen. To add a resource that is not in the library yet, select + New resource… in the list, or type its name and select + Create new resource ”…” (see New project-only items below).
- Choose a supplier and location: select from the suppliers and locations that currently have active library prices for that item. The price and unit fields appear once a supplier/location is chosen.
- Enter the project price: fill in the cost and unit. The project cost field uses currency format and accepts decimal values. Expand Quote details (optional) to record a quote reference and valid-until date. The valid-until date field uses Stralos’s standard date format (for example, 7 Sep 2026) so the date you enter is stored as shown, regardless of your browser’s locale.
Creating a new supplier or location while adding a rate
If the supplier or location you need does not exist yet, you can create it without leaving the drawer. Selecting + Add supplier or + Add location opens that form as a step inside the same drawer. Complete the step and the drawer returns to the rate form with the new entry selected. A new location needs an address picked from the list and its map position. Add location stays disabled until both are there, and a note says which part is missing: “Please add the site’s address so we can work out distances.” or “Please choose the address from the list so we can find it on the map.” When you drop a pin, its position arrives before the address is looked up, so wait for the address to fill in.New project-only items
To add a rate for a resource that is not in the Resource library, select + New resource… in the Resource picker, or type a name and select + Create new resource ”…”. Enter the name, choose a category, and choose the supplier and location. The resource is saved to this project only. If the category you need doesn’t exist yet, admins can select + New category… in the Category picker, or type a name and select + Create new category ”…”. The category form opens as a step inside the same sheet. Save the category to return to the rate form with it selected. Members aren’t offered this option.Choosing a supplier and location
For items that already have active library prices, the Supplier / location field shows the current active offers for that item grouped by supplier and location. Selecting one pre-fills the current price for comparison. Select Choose another supplier / location to open separate Supplier and Location selectors. This lets you add a price from a supplier that has no current library offer for the item, add a new supplier with + Add supplier, or add a location with + Add location. For new project-only items, the full Supplier and Location selectors open immediately. When using the separate selectors, the Location field lists every active location the supplier’s company has (branches, depots, quarries, and other sites), including locations that are not yet set up for pricing in the Resource library. Select a specific yard when its price applies only there, or leave Location set to All locations for a supplier-wide price.- If you pick a location that is not yet a price location for that supplier, Stralos links it automatically when you save the rate. The picker notes that adding the rate will make the location a price location.
- Any member can link one of a supplier’s own locations this way. Linking your company’s own sites is admin-only.
- If you do not have permission to link a location, it is still shown in the list but cannot be selected. The picker notes that an admin can add it in the Resource library.
- A location whose link was previously removed is shown but cannot be selected by anyone.
Bulk materials: density required
When the selected category is under Bulk Materials, a Density (t/m³) field appears and must be filled before you can save. Enter the material’s weight in tonnes per cubic metre, for example,1.7 for a typical aggregate.
When replacing a Resource library price for a bulk material item, Stralos pre-fills the density from the current price for that item and unit, checking the following sources in order: this supplier at the chosen location, this supplier at any other location, then the cheapest library price overall. The field stays editable: adjust it if this supplier’s material differs from the library record. If you change the priced unit after the density has been pre-filled, the pre-filled value is kept rather than reset.
If you enter a value over 5 t/m³, a hint suggests checking whether the figure may be in kg/m³ instead of t/m³. The hint does not block saving.
Stock units: conversion factor required
When the selected unit is Length (len), Roll Length (roll), Roll Area, or Sheet (sheet), a conversion factor field appears and must be filled before you can save. It records how much of the measured unit one of the priced unit covers:
Stralos uses this factor to order whole units, rounding up for each run separately. A work item line priced per length with a factor of 6 m orders enough whole lengths to cover each measured run; an offcut from one run is not reused to reduce the order for another. See Whole stock units for how ordering works.
When replacing a Resource library price at a stock unit, Stralos pre-fills the factor from the current library price for that item and unit, using the same source priority as the density pre-fill. The field stays editable: adjust it if this supplier’s stock differs. A stock unit option with no factor cannot price any metre or m² line.
Per-metre rates sold in set lengths
When the unit is metre (m), an optional Sold in lengths of (m) field appears. Leave it blank if the material isn’t sold in set lengths, and Stralos prices straight from the per-metre rate. When you fill it in, Stralos orders whole lengths to cover each measured run, rounding up per run, as for a per-length rate. For example, pipe at $12/m sold in 6 m lengths, with two 12.5 m runs, orders 3 + 3 = 6 lengths. If the supplier’s description mentions a length, a suggestion such as The description says 6 m lengths. appears with Use 6 m. Select it to fill in the field. Stralos never fills it in for you. Clear the field to price per metre again.Pack prices: items per pack required
When the unit is a pack, an Items per pack field appears and must be filled before you can save. Enter how many items one pack holds, for example100 for a box of 100 screws. It must be a whole number. Stralos orders whole packs, rounding up.
If the supplier’s description states a pack size, a suggestion such as The supplier’s description says 100 in a pack. appears with Use 100. Select it to fill in the field. Stralos never fills it in for you.
Import project rates from a file
Members and admins can import rates from an Excel, CSV, or PDF file directly into a project estimate. The importer reads the file using AI and saves nothing to your project until you confirm the import. The same steps and file rules that apply to the Resource library importer apply here: see Import rates from a file for the full walkthrough. The following differences apply when importing into a project:- The page title shows Import project rates and the back link returns to the estimate’s Project rates page.
- The page subtitle confirms which estimate the imported prices will be saved to: Imported prices will be saved to this estimate’s project rates.
- Rate item search is scoped to the items already in the project. Rows matched to an existing project rate item have their category locked and cannot be reclassified during the review.
- After a successful import, prices are saved to the current estimate’s project rates only. The shared Resource library is not changed.
- Stralos keeps a copy of the import file as a project document in a Rate imports folder. If the copy cannot be saved, a File not saved to the project notice appears, and your rates are still imported.
- Stralos automatically re-prices the estimate’s costs after the import completes. If repricing is still running when you return to the project, a banner confirms it will finish shortly.
- Open the project and navigate to Rates in the estimate workspace.
- Click Import rates.
- Follow the same upload, region selection (spreadsheets), and review steps as the library importer.
- Click Import N selected rates to confirm. Stralos returns you to the estimate’s Project rates page.
Replacing placeholder prices
A placeholder price is a project price you typed in by hand, for example while waiting for a supplier’s quote. When you import the quote, the importer can replace it:- A row with a name like a rate already in the project is matched to that rate and marked Matched to a rate in this project and Check this match.
- When a row will replace placeholder prices, a note under its match says so before you import, for example Replaces your placeholder price $45.00 per t (entered by hand). or Replaces Rolleston Quarry’s placeholder price $45.00 per t (entered by hand).
- A row replaces the matched rate’s placeholder prices that have the same condition and either no supplier or the row’s supplier. The quote’s supplier and location are used for the new price.
- If you choose a different rate item for the row, or Create new resource, nothing is replaced.
Inserting a rate into a work item
Insert into estimate items… opens a dialog listing the work items to add the rate to. Use Add estimate item to add more. For each work item, set:- Add to: one of the item’s activities, or Add to a new activity. A new activity is named after the rate. When the item has one activity, Stralos picks it; when it has none, Stralos uses a new activity; when it has several, you choose. Library activities can be chosen too.
- Quantity and its basis: per unit of the work item, or in total. Inside an existing activity the rate is charged for the whole activity, so the quantity is always a total. The quantity starts from the work item’s own quantity when its unit matches the rate. For a rate priced per pack, the starting quantity is in the item’s measured unit, not in packs.
Where it’s used
Where it’s used shows the priced and attached work items for one rate. From here you can:- Attach: record that this rate belongs in a work item so you can insert it later.
- Remove: remove an attachment without changing the work item’s cost.
- Insert…: add the rate to an attached work item’s cost.
Work item panel
Each work item has a Project rates button in its Rates & activities row. The button shows how many attached rates are waiting to be inserted. When you open the panel it shows the rates linked to this work item, either attached or already in the cost. If nothing is linked it shows every project rate and says so. The All project rates view lists the rates under category headings with a count, for example Materials › Fittings · 2. Search and the supplier filter narrow the rates within those headings. Insert is scoped to this work item. The panel also finishes any pending automatic re-price for rates already in this work item’s cost. A strip below the work item’s cost lines appears when attached rates are waiting to be costed; select Review and insert to open the panel.Automatic re-pricing
After any rate change, adding, editing, or deleting a price, or inserting one, Stralos automatically re-prices the work items that carry that rate. A toast message confirms how many work item lines moved. If automatic re-pricing could not complete (for example, while the estimate is still being updated), the page shows the pending state and lets you retry. When the estimate is submitted, its project rates are read-only, so nothing is re-priced.The Exceptions tab
The Exceptions tab lists pricing lines whose current choice or frozen pricing-rule outcome needs review. The count badge in the Project Rates header updates after each action and refreshes automatically after any rate write. Each exception card shows:- The work item and component name.
- A badge describing the exception kind.
- A plain-language description of the conflict.
- The cost difference where available.
- Leave unpriced: accept that this line has no eligible option.
- Use the rule’s option: switch the component to the rate the rule recommends.
- Pick another supplier: navigate to the component to select a different option.
- Keep the project rate: accept that the current project rate beats the rule and leave it.
Exceptions on a frozen estimate
On a read-only estimate, every decision button is disabled, including Keep the current price, Use the rule’s option, Use the automatic band, and the grouped … for all N buttons. Hover a disabled button to see why. Re-apply rate preferences… is disabled too. Actions that only open a picker or a price, such as Pick another supplier, Edit the project rate, and Widen the search radius, stay available so you can still review the pricing. If the estimate is submitted while you are reviewing and you then try a decision, Stralos shows the reason the estimate is read-only rather than a generic conflict message.Re-applying rate preferences
Re-apply rate preferences… opens a full review of every estimate line whose current price does not match the project’s stored rule list. Each affected line is shown with its cost change. Untick a line to keep its current price rather than switching it to the rule’s preferred option. Pinned lines start unticked and stay pinned unless you tick them.Good practice
- Use a project rate when the change is specific to this tender, rather than editing the shared Resource library.
- Record the supplier’s quote reference and valid-until date so expiring quotes are visible before they affect pricing.
- Review the Expired chip before submitting an estimate to confirm all expired quotes are still correct.
- Use Not costed to find rates attached to work items that have not been inserted yet.
- Check the Exceptions tab before sending an estimate for manager review. An unresolved exception may mean pricing does not match the agreed rate preference.